St. Louis Area District Welcome to MoDOT Banner Contact, Survey, Jobs, News, Site Map
Our mission is to provide a world-class transportation experience that delights our customers and promotes a prosperous Missouri.
Page Avenue (Route 364)


Crews pour the Harvester Bridge driving surface

 

WHAT'S HAPPENING NOW

Crews have finished building the Harvester Road bridge and removed the bypass which took traffic around the bridge.  The bridge has been connected to Harvester Road and been opened to traffic.  Drivers need to be aware of traffic pattern changes around the bridge.


Now, crews are working on grading and drainage for the main roadway between Jung Station and Woodstone and working on utility relocations, grading and drainage to construct the outer roads between Woodstone and Central School Road.  Crews will begin work soon on a bridge over Woodstone Drive just west of the Harvester Road bridge.


Traffic on Route 364 and Route 94 at Harvester (where Route 364 ends and Route 94 continues) is on the north and south outer roads around the construction zone.  To get to westbound Route 94 from Route 364/Route 94 in St Charles, drivers need to take the north outer road through Harvester and rejoin westbound Route 94 near Jungermann.  To get to Route 364 and Route 94 to St. Charles from eastbound Route 94, take the south outer road through Harvester and get on Route 364 (or exit just east of that for Route 94.)


The current projects are a portion of the second phase of the Page Extension on Route 364.  This current construction project project will extend Route 364 to Central School Road.  When completed, this project will improve traffic flow along Route 94/Route 364 to Central School Road by constructing a freeway with one-way outer roads (similar to Route 364 from Route 94 to Harvester Road).


This work will include the completed bridge at Harvester Road, plus bridges at Woodstone, Jungermann Road, and Central School Road, as well as entrance and exit ramps from the freeway.  This construction, when complete, will remove all traffic signals on Route 364 to Central School Road.


Work on the overall project is expected to be complete by mid 2012.

Current construction overview (837 kb, 1 page)

PAGE EXTENSION SELECTED FOR RECOVERY WORK

ARRA logoThe Missouri Highway and Transportation Commission has approved American Recovery and Reinvestment Act money for the next section of Route 364. This work has also been approved by the East-West Gateway Council of Governments. Fred Weber Inc. was awarded a $43.9 million contract to complete Route 364 from west of Harvester Road to west of Central School Road.

Proposed construction overview, Harvester Road to Central School Road (387 kb, 1 page)

 

 

PROJECT INFORMATION

The Page Avenue (Route 364) project will be completed in three phases.

Veterans Memorial Bridge (6/04)PHASE 1
West of Interstate 270 to Route 94 (four lanes each direction with an auxiliary lane) is complete.

Maps of Phase 1


PHASE 2

Along Rte. 94 from east of Harvester Rd. to Mid Rivers Mall Dr.

Projects currently under construction:

  • Route 364 from west of Jungs Station Road to west of Harvester Road. The Harvester Road bridge is complete and traffic has moved to that bridge. Crews are completing grading and draining for the main roadway
  • Route 364 from west of Harvester Road to west of Central School Roads. Includes bridge construction at Woodstone, Jungermann Roads and Central School Road, as well as construction of the Rte. 364 outer roads. This project has been awarded and utility relocation is on-going.

Upcoming projects

  • Route 364 from west of Central School Road to Mid Rivers Mall Drive. Includes bridge construction at Kisker Road and Mid Rivers Mall Drive, as well as construction of the Rte. 364 outer roads. Design work for this project is currently underway and funding has been determined. This project should be e let early in 2010.  

Maps of Phase 2

PHASE 3

From Mid Rivers Mall Dr. to Rte. 40/61

Projects completed:

  • Route 364 future south outer road from Rte. K to Winghaven Blvd. Crews have completed work on the future Page Avenue (Route 364) south outer road project. The new south outer road runs parallel to Rte. N between Rte. K and Bates Rd. in the city of O’Fallon. View a map of the south outer road improvements. (107 kb, 1 page)

All other Phase 3 Route 364 projects (no funding has been secured):

  • Much design work has been completed. MoDOT has purchased approximately 50 percent of the right of way needed. Little money is available at this time to buy more property. No other money has been allocated for construction. No construction start dates have been set.
  • Estimated cost in 2008 dollars to purchase the remaining right of way and construct Phase 3 of Page Avenue is $140 million.

Maps of Phase 3

Environmental Impact Statement Documents

Related Links:

Documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

Sign up for e-updates

MoDOT wants to ensure all stakeholders stay updated and informed about the project during construction. We will send out periodic "e-updates" via e-mail when they become available. If you would like to be added to this list, please send an e-mail to Andrew Gates at Andrew.Gates@modot.mo.gov. If you do not have access to e-mail, you can call MoDOT toll-free at 1-888-ASK MODOT (275-6636) for updates on the project.


FOR MORE INFORMATION, CONTACT:

St. Charles County Area Engineer Jim Gremaud at 1-888 ASK MODOT (275-6636)

Project Manager Barry Bergman at 1-888 ASK MODOT (275-6636)

Community Relations Specialist Andrew Gates at 1-888 ASK MODOT (275-6636)

 

(updated August, 2009)

   
   
TRAFFIC CONTACT CONTACT SURVEY SURVEY CAREERS CAREERS NEWS NEWS SITEMAP SITEMAP TRAFFIC Kansas City Area Southwest District North Central District Central District Springfield Area Northeast District St. Louis Area South Central District Southeast District Northwest District